Light Touch Integration is designed to be deployed on low complexity sites, where multiple mobilizations are either expensive or logistically difficult
Consider the following scenarios:
You want an installation team to integrate the SIAD as soon as it's installed, but still want an Elite technician to perform BTS integration and power testing.
Your DAS commissioning is several weeks out after integration.
Consider the following scenarios:
You want an installation team to integrate the SIAD as soon as it's installed, but still want an Elite technician to perform BTS integration and power testing.
- Simply plug in your laptop when the SIAD is installed and contact our support team.
Your DAS commissioning is several weeks out after integration.
- Send the Light Touch kit to your on-site commissioning team, and our engineers will direct power testing, and collect readings for troubleshooting and COP documentation.